LENOVO PROJECT | BUILDINGS 7 & 8
Working long shifts with multiple crews performing prefab assembly in our warehouse and simultaneous installation on the job site, the Structured Cabling and Audio-Visual departments completed this massive fast-track project on time and with glowing praises from customer to consultant to general contractor. Throw in the mix a daily changing design and it makes this crowning achievement even more impressive, and the largest project in Strategic Connections history.
For the record:
- Total man-hours over 32,000
- Crew size as large as 65 people on site
- Over 27,000 Cat-6 drops
- 20 individual labs
- Over 2 million feet of cable
What makes this truly amazing and a project we are very proud of, is that all of this was completed in a three month period.