LENOVO BUILDINGS 7 AND 8

Working long shifts with multiple crews performing prefab assembly in our warehouse and simultaneous installation on the job site, the Structured Cabling and Audio-Visual departments completed this massive fast-track project on time and with glowing praises from customer to consultant to general contractor. Throw in the mix a daily changing design and it makes this crowning achievement even more impressive, and the largest project in Strategic Connections history.

For the record:

  • Total man-hours over 32,000
  • Crew size as large as 65 people on site
  • Over 27,000 Cat-6 drops
  • 20 individual labs
  • Over 2 million feet of cable

What makes this truly amazing and a project we are very proud of, is that all of this was completed in a three month period.

lenovo-crew

Lenovo-Fleet